Rib Raft slabs (upper 31m² & lower 63m²) as Per drawings attached. bottom slab just needs concreting done top slabs needs cut (which we will do) and then finished off after by chosen contractor.
#1 | Tradie 1 |
|
121 jobs | No longer in contact |
#2 | Tradie 2 |
|
1 job | No longer in contact |
#3 | Tradie 3 |
|
5 jobs | No longer in contact |
#4 | Tradie 4 |
|
20 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
#6 | Tradie 6 |
|
41 jobs | No longer in contact |
#7 | Tradie 7 |
|
83 jobs | No longer in contact |
Partner with Builderscrack
Get work