Existing slab is 1.4 x 2.1 m and it tilted during earthquake. Now about 3 cm height difference from one side to the other. We want to put a storage unit onto a level area. Either remove existing slab and replace; or grind level; or top-coat with about 4 cm thickness to make level even if higher than now..
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Two well-mannered and competent young men did the job tidily and efficiently. My partner was impressed that they took off their shoes before coming inside to use the toilet. We are entirely happy with this job. I deducted one point ofr "Schedule" because they started work about an hour later than expected, but that only happened one day.
Work carried out by an employee of the company
Reviewed on 16-01-2015