Hi I just need the top of my drive relaid. It is about 15m2. The rest is fine and I have cut the drive and removed all the rubble. Points to note: I am keeping the path going through it (as we wont be driving cars on it. ) There is a slight slope which I hope to level off a bit, so it will probably need a small gully (with drain cover) at the garage end of the patch. It is mostly already boxed and may (or may not) need mesh-we can discuss.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
2.0
|
Communications |
5.0
|
Work carried out by an employee of the company
Reviewed on 15-06-2021
Partner with Builderscrack
Get work