I am after someone to replace the existing packers under my floor between the joist and the pile and re tie the joist to the pile. The existing packers are not H3 treated. I need treated packers preferably by the end of this week. There are approximately 15 piles to re pack
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Carried out the works as discussed. Got in touch quickly when an issue came up with the works which we were able to resolve very quickly.
Work carried out by the owner/operator
Reviewed on 03-09-2018