• To remove existing portion of concrete from top of steps : 1.5m² and replace with 100mm thick plain concrete on maximum of new 100mm thick base course and cart to waste. • Works will require hand removal and access is restricted. • Pathways surrounding dwelling – 48m² • To remove existing asphalt and replace with 100mm thick plain concrete on maximum of new 100mm thick base course and cart to waste. • To form dish channel to bottom of rear retaining wall when concrete is placed. • To form around and protect gully traps
#1 | Tradie 1 |
|
90 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 11 jobs | No longer in contact |
#3 | Tradie 3 |
|
3 jobs | No longer in contact |
Partner with Builderscrack
Get work