i need the ground dug out for a 6m by 3m garage floor then pore the floor and then put 3 rows of blocks ie 600 ml around the foundations
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
5.0
|
they were held up due to the weather but this was beyond their control
Work carried out by the owner/operator
Reviewed on 19-08-2017
Partner with Builderscrack
Get work