We're going to rip up the tiling outside our front step and lay new ones. In preparation for this we need a new concrete pad installed. We understand this will need to cure for a month before the tiler can start. We will rip up the old tiles so you can get straight to work with laying a level concrete pad. The area is 2.3m x 1.6m wide. We would need this job done in W.c 5th June.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great find, very impressed with how they got the job done on time and on budget.
Work carried out by the owner/operator
Reviewed on 25-06-2023
Partner with Builderscrack
Get work