Review

Front stairs require levelling and retiling

Job image
Job image
Job image

Job description

Concrete Crack Injection
Auckland

The concrete stairs have sagged/moved causing the tiles on the top step to crack and the top step to become uneven The top step required levelling and new tiles installed.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Great job, good communication and adapted to a change with no probs

Work carried out by the owner/operator
Reviewed on 19-01-2023

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo