Need a concrete path down the the side of our house sloping towards the street and away from our house to direct surface water. Roughly around 14 - 16m long by 1m. Some small excavation / levelling of ground will be required and foam / protective inserts laid around pipes at side of house for wastewater and flood water.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Regan and the team went above and beyond with the path. His communication was on point every step of the way and the job was on-time and on budget. Defiantly use him and his team again in the future.