Approximately 50m driveway and turning bay needs the existing asphalt removed and replaced with concrete. Careful consideration required for water runoff. Also looking to have a concrete block fence build.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
5.0
|
Work carried out by a subcontractor
Reviewed on 25-04-2022
Partner with Builderscrack
Get work