Kerb stones both sides of drive and drainage. Drainage leads into a storm water culvert. Drive is currently grey gravel finish to be red/pink as currently in turning area by garage. There is no time-line but sometime within the next 6 months would be good. Photos of the house and grounds are available on line. just enter the address 1583 Ponga Road. Drive is over 50m long
#1 | Tradie 1 |
|
10 jobs | No longer in contact |
#2 | Tradie 2 |
|
65 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 6 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 0 jobs | No longer in contact |
#5 | Tradie 5 |
|
85 jobs | No longer in contact |
#6 | Tradie 6 |
|
21 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 174 jobs | No longer in contact |
Partner with Builderscrack
Get work