Published: 25 November 2019
I have an approximately 22 m2 area that I would like concreted in February. The area will be cleared by a digger and gravelled to the required depth (I will arrange this). The concrete needs to be thick enough to support the weight of a container and one side of the concrete needs to be edged with concrete blocks as shown in the picture.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent job and communication. Will use again.
Work carried out by the owner/operator
Reviewed on 19-03-2020
Tradesperson reply
"Thank you for the great feedback it is a pleasure to work with you"
Partner with Builderscrack
Get work