About 5m^2 of standard thickness concrete paving to be removed. Also about 1-2m^2 new concrete laid in another nearby position, and a bench embedded into it.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
3.0
|
Good job, no problems. Once the point is got across the job was excellently done but it is important to talk directly on site in case of misunderstanding.
Work carried out by the owner/operator
Reviewed on 03-11-2018
Partner with Builderscrack
Get work