Prepare area and lay concrete base approximately 4.4m x 2.85m using suitable construction for a shed. Repair the side walls where earth has been excavated. Re-connect/lay in 100mm drainage pipe about 4.4m long. Remove all debris from site and tidy
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Good job done on time and on budget. Thank you
Work carried out by the owner/operator
Reviewed on 29-03-2023
Partner with Builderscrack
Get work