Published: 30 March 2023
Remove existing plywood . Adjust frame for openings, paper, cavity battens, plywood and batten. Window and door refit with head flashings. New barge boards. 3m stud. 10.5m long and 6m wide. Labour only. Scaffold on site.
#1 | Tradie 1 |
|
14 jobs | No longer in contact |
#2 | Tradie 2 |
|
39 jobs | No longer in contact |
#3 | Tradie 3 |
|
7 jobs | No longer in contact |
#4 | Tradie 4 |
|
1 job | No longer in contact |
#5 | Tradie 5 |
|
69 jobs | No longer in contact |
#6 | Tradie 6 | Not reviewed | 1 job | No longer in contact |
#7 | Tradie 7 |
|
65 jobs | No longer in contact |
#8 | Tradie 8 |
|
2 jobs | No longer in contact |
Partner with Builderscrack
Get work