We have several cracks across the bottom two lines of hardie weather boards. I would like these taken out and replaced with new ones. I would like quotes on replacing the bottom two rows of weather boards please Thanks
Workmanship |
4.0
|
Cost |
3.0
|
Schedule |
1.0
|
Communications |
1.0
|
The two managers of triple eight contractors were not good to deal with. Bad communication and did not keep to timelines. The sent a apprentance to rip off weatherboards and he didnt do the best job. Finally a builder was sent, who was VERY VERY good. great communication and amazing workmanship. It was unfortunate the two managers did such a bad job communicating and delivering on times. otherwise if id dealt with the builder the whole time this would of been a 10/10 review
Work carried out by a subcontractor
Reviewed on 04-02-2021
Tradesperson reply
"There was a delay in the delivery of the weatherboard due to back logs from lock down orders. The owner was advised of this and told he could collect it himself if he wished for the materials to be on site sooner. The overall state of his cladding was very bad and had to be carefully removed and replaced. This is the type of customer that will try to make reasons so not to pay full cost."
Partner with Builderscrack
Get work