Remove 3sqm of decking. Cut 2m long x 500mm wide channel in concrete (under deck). Remove cut concrete. Dig trench 600mm depth x 2m long (in preparation to lay pipe-work). Note: decking should be cut so it can be replaced.
Workmanship |
5.0
|
Fast, efficient, affordable
Reviewed on 20-05-2009
Partner with Builderscrack
Get work