Think floor needs some prep first as a I am not a professional not sure exactly what it is bare concrete at this stage then lino laid around toilet and length of room 3.2 m x 1.5m. One end of room is toilet other end is shower that needs lino laid in it as well, coyinuation of floor. Hope this makes sense
Partner with Builderscrack
Get work