Active job

Replace particle board flooring in bathroom

Job description

Floor Board Repair
Western BOP

Remove the last of the floor tiles that were laid over the particle board. Replace all the damaged flooring (approx 2x3 m) with plywood. Fit mouldings appropriate for coved vinyl. Repair a perforation in the adjacent room and repair the ceiling (approx 800 x 600mm) below the damaged floor. All fittings have been removed from the bathroom


Trade professionals

#1 Tradie 1 No recent reviews 22 jobs No longer in contact
#2 Tradie 2
114 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo