Would like to add a first floor timber deck to an existing house on a flat site. Proposed timber floor and balustrade, with external stairs to the outdoor grassed area. Would like to have work complete within 6-9 months.
#1 | Tradie 1 |
|
56 jobs | No longer in contact |
#2 | Tradie 2 |
|
19 jobs | No longer in contact |
#3 | Tradie 3 |
|
78 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 11 jobs | No longer in contact |
#5 | Tradie 5 |
|
47 jobs | No longer in contact |
#6 | Tradie 6 |
|
39 jobs | No longer in contact |
#7 | Tradie 7 |
|
16 jobs | No longer in contact |
#8 | Tradie 8 |
|
17 jobs | No longer in contact |
Partner with Builderscrack
Get work