We have an urgent small floor repair job. There are three small holes in an T & G floor in a large hall that need to be patched. I think the job would involve removing a small section of the floor and replacing it with flooring grade particle board. Carpet would need to be replaced over the patch (we have some that should fit). The floor is subsequently being covered with vinyl so just a basic fix required - to ensure a smooth surface. Job must be completed by 31 December.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Chris was able to come at short notice to do an urgent repair job. He was professional, responsive and the work was to a good standard. Would definitely use again.
Work carried out by the owner/operator
Reviewed on 09-01-2016
Tradesperson reply
"Thanks for your comments
"
Partner with Builderscrack
Get work