Rotten ply deck floor (5.4m x 2.1m) needs replacing to a state ready for waterproofing company to complete their job. Its Possible some framing might need to be replaced. 2.4 metre bifold door might need to be temporally removed for water proofing to be completed. If possible re slope deck away from the house or we may leave how it is, to be discussed
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Jesse was great to deal with. turned up on time. Gave his professional opinion on the job but also flexible with our ideas, did a good job, would recommend and use again
Work carried out by the owner/operator
Reviewed on 11-08-2023
Partner with Builderscrack
Get work