The railing assembly needs to be removed and dumped, Gib stopping to be done if required. need the job done in approx 15 days.
#1 | Tradie 1 |
|
162 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 5 jobs | No longer in contact |
#3 | Tradie 3 |
|
19 jobs | No longer in contact |
#4 | Tradie 4 |
|
97 jobs | No longer in contact |
Partner with Builderscrack
Get work