6 month timeframe. Concrete wall next to boundary. Wood or steel frame rear and opposite to concrete. There is an existing concrete pad. Build floor plywood 6000 wide x 7000 long. Lift existing garage onto ply wood floor which would be approximately 2900 high. I can do the rest.
#1 | Tradie 1 |
|
3 jobs | No longer in contact |
Partner with Builderscrack
Get work