Repair to the wall where tiles were removed. Corners to be made good ready for painting. Some of chip subfloor may need replacing with plywood once tiles have been lifted. Pantry doors to be removed and create opening instead. Once the repair work has been done, I’ll then need to plaster and paint before the kitchen goes in.it is a trade me kitchen that will need alterations to make it fit. In the photos I have shown the wall damage, the pantry to be altered, the old kitchen, (it is now partially removed, photos included) and the purchased trademe kitchen
#1 | Tradie 1 |
|
32 jobs | No longer in contact |
#2 | Tradie 2 | Not reviewed | 1 job | No longer in contact |
Partner with Builderscrack
Get work