Two posts supporting a 1st floor deck need replacing. It is likely that it will require splicing in a new bottom half of the posts whilst supporting the deck with props. The top part of the posts are integral to the structure of the deck and are sound. The bottom is set into a metal fitting bedded in concrete which can be re-used
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Tony was great. Easy to deal with. Tidied up after himself would definitely use him again
Work carried out by the owner/operator
Reviewed on 15-09-2015
Partner with Builderscrack
Get work