Active job

Deck on ground level

Job description

Decking & Pergolas
Rodney

I need a deck built in the next 2-3 weeks. It will be approximately 4.5 metres by 3 metres at ground level. No big holes to dig for piles but level crossbeams on ground needed. Using treated pine decking 138 mm grip or similar. Exact measurements needed to finalise quote.


Trade professionals

#1 Tradie 1 No recent reviews 15 jobs No longer in contact
#2 Tradie 2
18 jobs No longer in contact
#3 Tradie 3 No recent reviews 20 jobs No longer in contact
#4 Tradie 4 No recent reviews 17 jobs No longer in contact
#5 Tradie 5 No recent reviews 7 jobs No longer in contact
#6 Tradie 6
64 jobs No longer in contact
#7 Tradie 7
37 jobs No longer in contact
#8 Tradie 8
70 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo