Review

Deck Joist

Job image

Job description

Decking & Pergolas
North Shore

Install new joist approx. 100mm out from existing joist to allow ventilation duct to pass through deck against wall. Create penetration through original joist for ducting to pass through. Refix decking as required into new joist, leaving edging plank lose for ventilation installers. Proposed solution in photos, other ideas welcome. Quote required Work must be completed before 22 March


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Work carried out by the owner/operator
Reviewed on 08-10-2023

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo