Our deck needs removal of rotting rails, balustrades and steps. New rail posts, top and cap rails, balustrades, steps (15 steps), and side rails need to be built. Replacement of decking timber not required. To save cost, we will buy the materials required. Rail length 11 meters, side rail length 5 meters.
#1 | Tradie 1 | No recent reviews | 57 jobs | No longer in contact |
#2 | Tradie 2 |
|
33 jobs | No longer in contact |
#3 | Tradie 3 |
|
43 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 7 jobs | No longer in contact |
Partner with Builderscrack
Get work