66 sq metre deck at ground level on existing wooden frame Remove old decking Lay new composite decking May require new supporting frame, quote on both just deck and framing plus deck Timeframe to suit Existing aluminium pergola frame sits on deck, will need to be worked around
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent communication throughout. Was ready to start earlier than we were. Ran over time purely due to adverse weather conditions. Actual work days (including extra required) were on plan. Cost as oer quote, no unforeseen extras Photos are too large to upload. But excellent finish.