We need a frame built over slightly sloped concrete to put a spa pool on. Guessing it will just be --- ripped on angles and linked together. Spa pool is --- . Need done fairly quickly, pool is due to be delivered at the end of the month.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Izzy did a great job we were very happy with it. He even put in extra hours on a Sunday to get the job completed after he was let down by his crew.
Work carried out by the owner/operator
Reviewed on 03-04-2022
Partner with Builderscrack
Get work