We have a decking which had a spa pool as part of it. The spa pool has been removed leaving a large gap in the decking. The job will involve redoing the decking foundations where the spa pool was. At this point, the assumption is that the existing decking foundations are still sound. There maybe a separate task to replace the decking timber but that task will not be decided until the foundations are all done and ready for the decking to be completed. The task is not urgent as it has been like it for the last 6 months. It would be good to make a start before winter sets in though.
#1 | Tradie 1 |
|
106 jobs | Secured job |
#2 | Tradie 2 |
|
152 jobs | No longer in contact |
#3 | Tradie 3 |
|
29 jobs | No longer in contact |
#4 | Tradie 4 |
|
11 jobs | No longer in contact |
#5 | Tradie 5 |
|
59 jobs | No longer in contact |
Partner with Builderscrack
Get work