I am getting prepared for my bathroom to be tiled, to do so I need a few small jobs done in the bathroom before it can be done. 1/ need a door frame taken off and smoothed with gib and plaster so you never new a door was on it 2/ A cupboard (image provided) in bathroom to the hot water cylinder needs a door on it and maybe some work to bring it up to spec (it is currently pretty shoddy) 3/ Outside, some weatherboards are upside down (who does that?) :) thanks
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
I was exceedingly pleased with the professionalism and workmanship from Lloyd. I will definitely be keeping his business card for other jobs. Thank you Lloyd
Work carried out by the owner/operator
Reviewed on 20-01-2017
Partner with Builderscrack
Get work