A small deck at a vacated rental property. New tenants are likely to move in around 7 July. So job needs to be done before hand. Deck material could be composite or pine. It's important that it's cost effective. We can remove the concrete wall. Deck is to go over the bottom step. Access is good, there is a gate right next to the site. The house will be undergoing renos at the same time, so is also accessible.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
I couldn't be happier with Steve and his work! Such a nice guy, great workmanship and great value. He build an awesome deck for us for a great price.
Work carried out by the owner/operator
Reviewed on 14-07-2023
Partner with Builderscrack
Get work