We are wanting a deck built out the back of our house. We want it to be level with concevitry floor. Need it going from side of the house out approx 3m and from conceritry to the far conner. I will be removing the clothes line and spa pool.
#1 | Tradie 1 |
|
473 jobs | No longer in contact |
#2 | Tradie 2 |
|
4 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 37 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 1 job | No longer in contact |
#5 | Tradie 5 |
|
4 jobs | No longer in contact |
#6 | Tradie 6 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work