We have a small deck (approx 5 x 2.5m), and the bearers and joists are rotten, so will need the whole thing replaced like for like. On concrete piles. This deck leads off some french doors, and ties in with some concrete steps, and a lower level deck (more recent, and is sound). There is also a hatch for access to a drain. See photos. Job would include dismantling and removing old timber etc from site. Job has a tight time frame - needs to be done between now and 8 April at latest.
#1 | Tradie 1 |
|
49 jobs | No longer in contact |
#2 | Tradie 2 |
|
52 jobs | No longer in contact |
#3 | Tradie 3 |
|
49 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 16 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 11 jobs | No longer in contact |
Partner with Builderscrack
Get work