The overhead power line was drag down from the high wind last weekend , the power line has been repaired and power has restored, but the barge board has been damage when the line was dragged down and a piece of soffit was cracked as well, so we need to get the barge board and soffit replaced . the electrician advised when you carry out the work they will need to isolate the power and remove the entry point , after job done they will install them and mount them properly before restore the power , they also recommend when you replace the soffit , please add a few more timber underneath , so they can mount the box firmly.
#1 | Tradie 1 |
|
30 jobs | No longer in contact |
#2 | Tradie 2 |
|
155 jobs | No longer in contact |
#3 | Tradie 3 |
|
213 jobs | No longer in contact |
#4 | Tradie 4 |
|
14 jobs | No longer in contact |
Partner with Builderscrack
Get work