I've just had my hot water cylinder upgraded in my 1960s house from a low pressure cylinder to a much larger mains pressure tank. The original shelving had to be removed to accommodate the new cylinder and I would like the shelving rebuilt around the new cylinder using where possible the existing rimu wood which is currently in a pile in my garage. **I meant to add the doors and cabinetry need to be put back in place too but the plumber sawed through the wood framing to access cylinder faster so it will need to be sorted.**
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 10-07-2019
Partner with Builderscrack
Get work