After excavating to build a garage, the bottom step is now approx a 470mm step up. Thoughts at this stage is to cut the existing top step back and realign / rebuild the rest of the steps. The bottom 1-2 steps will be down onto a concrete path. Open to options on the best way to remedy.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent to deal with, very happy with the work completed as Kliment takes pride in his work and communicated well throughout. I will definitely be using Kliment for other jobs in the future.
Work carried out by the owner/operator
Reviewed on 05-03-2021
Tradesperson reply
"Thank you :)"