Hi All, We're hoping to build a new timber deck (42m square ish) . The deck will almost be ground level so no stairs or handrails needed. I've attached a layout plan of the deck and some site photos. Note, prior to the deck being built I'll have the cobbles removed and a small digger come in to lower the ground level to what we require for the decking. We'll also dig in a gully trap to reduce the risk of water pooling under the deck. We'll need a couple of weeks to remove cobbles and have digger in, but we are hoping to get this built sooner rather than later. So please make contact if you could start the job soonish. Cheers, Adam ---
#1 | Tradie 1 |
|
181 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 3 jobs | No longer in contact |
#3 | Tradie 3 |
|
30 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 0 jobs | No longer in contact |
#5 | Tradie 5 |
|
18 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 17 jobs | No longer in contact |
#7 | Tradie 7 |
|
5 jobs | No longer in contact |
#8 | Tradie 8 |
|
64 jobs | No longer in contact |
Partner with Builderscrack
Get work