I need a deck to be built around 4 sides of a swimming pool that is under construction. There is also two low retaining walls to be built.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 12-04-2019
Partner with Builderscrack
Get work