Review

Hot Water Cylinder Cupboard

Job description

New Cupboard Doors
Waitakere

Build New Hot Water Cylinder Cupboard


Review

Workmanship
1.0
Cost
1.0
Schedule
5.0
Communications
3.0

The cupboard looks ugly as the material used, ply board, is splitting and separating within 6 weeks of being made, internal shelf is buckled, not screwed down and there are gaps so things fall down the gap. The top and bottom cupboard doors rub on each other, it is difficult to close and open them. Builder suggested glueing down the layers that were separating but in the end he screwed them down! Its so ugly and I have to look at them every time I look at the ugly cupboard.He says you get what you pay for and this is true but if I had of been informed of the risks that plywood could separate I wouldnt have opted for it and I should have been given options of other material to be used as well. It looks as though a college student has put the cupboard together as a school project, amateur work.

Work carried out by the owner/operator
Reviewed on 24-09-2010

Tradesperson reply
"Kia Ora,Im happy to cover the cost of replacing cupboard with new and to your requirerments.If your happy to cover the cost of painting and supplying better hingers. I can be over in two weeks the saturday if that suits. Mark."

Verified Builderscrack review

Trade professionals

#1 Tradie 1 No recent reviews 29 jobs Secured job
#2 Tradie 2
58 jobs No longer in contact
#3 Tradie 3 No recent reviews 9 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo