1. Finish installation of flat pack kitchen, including attaching profile panels, laminate benchtop / sinks (cabinet carcass are made and mostly installed) 2. Shelves in pantry 3. Reinforcement in roof cavity and install of range-hood 4. Lay laminate flooring in small porch area and toilet space Need it completed before July.
#1 | Tradie 1 |
|
197 jobs | No longer in contact |
#2 | Tradie 2 |
|
3 jobs | No longer in contact |
#3 | Tradie 3 |
|
0 jobs | No longer in contact |
#4 | Tradie 4 |
|
2 jobs | No longer in contact |
#5 | Tradie 5 |
|
0 jobs | No longer in contact |
#6 | Tradie 6 |
|
2 jobs | No longer in contact |
#7 | Tradie 7 |
|
4 jobs | No longer in contact |
Partner with Builderscrack
Get work