Active job

Install kitchen range hood cabinet and floating shelves

Job image
Job image
Job image
Job image

Job description

Kitchen Cabinets & Shelving
Christchurch

Install 900mm wide by 720 mm high white kaboodle rangehood cabinet centered above the stove. Also attach doors. Then put in two strong floating shelves between the wall and the cabinet. Ideally use plywood or solid wood for cupboard doors and shelving. Finish to complement the wooden hotwater cupboard and hallway doors. The shelves need to be strong enough for lots of plates, cups and glasses as the kitchen doesn't have much storage. Happy for you to get the materials for job and bill me or for me to order them for you- whatever works for you. Nb we are going to get someone to remove the old rangehood and install a new rangehood in this cupboard so the job is a little dependant on when they have done the ducting hole and shifted any plugs around that need to shift. The second and fourth photos show the kitchen as it is now. The third photo gives you an idea of the placement of the finished cabinets and shelves. ( Though ours won't be all the way up to the ceiling).


Trade professionals

#1 Tradie 1
3 jobs No longer in contact
#2 Tradie 2 No recent reviews 0 jobs No longer in contact
#3 Tradie 3
211 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo