I am wanting to make several updates to my house before I get carpet and flooring laid. 1. Wardrobes: A new double wardrobe built with shelving down one side; Shelving added down one side and doors replaced on a second wardrobe 2. Study/Linen cupboard: Existing linen cupboard to be widened but made less deep, and internal sliding door removed. Desk. shelving and cupboard to be built into the small study area.
#1 | Tradie 1 | No recent reviews | 14 jobs | No longer in contact |
#2 | Tradie 2 |
|
34 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 2 jobs | No longer in contact |
#4 | Tradie 4 |
|
211 jobs | No longer in contact |
Partner with Builderscrack
Get work