Published on 24 October 2024
Close gap with wood. A opossum got in the gap which is approx. 6 inches along front. 1st photo is length of gap. 2nd photo tidy up exposed area by putting a panel to cover up or wood. I have wood lengths on site
Workmanship |
5.0
|
Cost |
2.0
|
Schedule |
5.0
|
Communications |
3.0
|
The job was quoted on the pictures to $500+ then changed to $352+ as it was likely to only require 1 panel cut to fit the area. Liz came to do a site visit before builder came next day and never said it was going to cost what it did. Job was completed by a build team of 2 who did a great job in a couple of hours. I'd have paid $500+ but when the invoice for $915 came (which I paid) I was disappointed. Master builders work on my property whose quotes were bang on this was a major departure
Reviewed on 13 November 2024
Tradesperson reply
"Thanks April. As long as the work does not change or vary from the quote in anyway we are able to honour our quoted pricing. However I do understand where you are coming from in terms of costs being disappointing. Unfortunately the materials to complete building work are not cheap either, so I understand your frustration"
Partner with Builderscrack
Get work