Published: 24 October 2024
Close gap with wood. A opossum got in the gap which is approx. 6 inches along front. 1st photo is length of gap. 2nd photo tidy up exposed area by putting a panel to cover up or wood. I have wood lengths on site
Workmanship |
5.0
|
Cost |
2.0
|
Schedule |
5.0
|
Communications |
3.0
|
The job was quoted on the pictures to $500+ then changed to $352+ as it was likely to only require 1 panel cut to fit the area. Liz came to do a site visit before builder came next day and never said it was going to cost what it did. Job was completed by a build team of 2 who did a great job in a couple of hours. I'd have paid $500+ but when the invoice for $915 came (which I paid) I was disappointed. Master builders work on my property whose quotes were bang on this was a major departure
Reviewed on 13-11-2024
Tradesperson reply
"Thanks April. As long as the work does not change or vary from the quote in anyway we are able to honour our quoted pricing. However I do understand where you are coming from in terms of costs being disappointing. Unfortunately the materials to complete building work are not cheap either, so I understand your frustration"
Partner with Builderscrack
Get work