Hi everyone, I have changed from wanting piles to a concrete pad if anyone can still do the job. This is a cheaper option for me. The house is 137 sq meters, it is a 1960's brick cladding, aluminum joinery, tile roof, with native timber flooring. Need the house to be put on piles as I live on Maori land with occupancy rights from trustees, owners and Maori Land Court.
#1 | Tradie 1 | No recent reviews | 2 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 8 jobs | No longer in contact |
#3 | Tradie 3 |
|
21 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 9 jobs | No longer in contact |
#5 | Tradie 5 |
|
60 jobs | No longer in contact |
Partner with Builderscrack
Get work