A building inspector has found a rotten joist during a pre-sale inspection. Replacement of joinst required.
Workmanship |
3.0
|
Cost |
3.0
|
Schedule |
3.0
|
Communications |
3.0
|
Work completed did not pass building inspection. The building inspector phoned the builder indicating what was not completed correctly. Builder agreed to return and put right what was wrong. The final result was acceptable and passed inspection.