Published: 20 May 2020
The facing boards on the gable have rot. We want to replace them. Because of the height we are planning to do the work in conjunction with the installation of continuous spouting. The aim is to use the same scaffolding.
#1 | Tradie 1 | No recent reviews | 18 jobs | No longer in contact |
#2 | Tradie 2 |
|
25 jobs | No longer in contact |
#3 | Tradie 3 |
|
374 jobs | No longer in contact |
#4 | Tradie 4 |
|
146 jobs | No longer in contact |
#5 | Tradie 5 |
|
3 jobs | No longer in contact |
Partner with Builderscrack
Get work