Review

Reinforce 600mm heigh retaining wall & build steps #2

Job image
Job image
Job image
Job image

Job description

Decking & Pergolas
Waitakere

The retaining wall only has small, weak, shallow posts holding it in place with a couple of screws on each side to give it some added security. Things that need to be done are (i am going to dig a trench down to ground level before the work is started) - a hole borer to go another 400-600mm deep at 3-4 places along the wall - concrete fence posts in - lay a 5m length of nova coil to add some drainage (there is a small pit that this can be channeled into) - secure the wall to the posts with some kind of bolts - build steps 2 steps along the width of the retaining wall each 200mm high I can dig most of the trench for you before you start the job and backfill it once everything has been done. Also, be aware that the only site access is through the house.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Massimo was great. He communicated the whole time on exactly what he was doing, which I loved because I can be a bit particular when it comes to the details. The finished work exceeded our expectations and we will be using Crea Construction LTD again. Highly recommend to anyone looking to get great quality work done at a fair price.

Work carried out by the owner/operator
Reviewed on 24-01-2024

Tradesperson reply
"Thanks Matt, reviews like yours are what my goal is. Enjoyed working alongside you guys. Thanks"

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo